Not enough room for the Széchényi to pass

Széchényi held up in DeggendorfSzéchényi held up in Deggendorf

Date: 
11.08.2007

Increased water levels resulting from heavy rains caused the JDS2 cargo and accomodation ship Széchényi to stop today at Deggendorf, Germany, about 70 km downstream from the JDS2 launch

Loading the Argus

Loading up the shipsLoading up the ships

Date: 
07.08.2007

From August 5 to 7, the laboratory ship Argus, and cargo carrier and sleeping base ship Széchényi, were loaded up with four truckloads of scientific equipment, sampling vessels and consumables i

Syndicate content